Frank Huber
Frank Huber
ZHAW
School of Engineering
Research profile Product Development Simulation
Lagerplatz 22
8400 Winterthur
Work at ZHAW
Position
Lecturer for Product Development
Teaching
Professional development teaching
CAS Product Innovation and Leadership for Engineers
Education and Continuing education
Experience
- Technical Sales Coating Technologie
STI Hartchrom AG
09 / 2009 - 04 / 2012 - Business Consultant
Werren & Thomann GmbH
01 / 2008 - 08 / 2009 - Application Engineer Forming Technologie
Hydrel GmbH
11 / 2002 - 12 / 2007 - Head of Design Textile Machines
Saurer Hamel AG
10 / 1996 - 10 / 2002 - Head of Design Plant Engineering
Kalt Maschinenbau AG
09 / 1995 - 09 / 1996 - Design Engineer Tool Machines
L. Kellenberger & Co. AG
01 / 1990 - 08 / 1995
Education
- Business Engineer STV / Marketing/Sales
KS Kaderschule
10 / 1996 - 06 / 1998 - Ingenieur FH / Maschinentechnik
Ingenieurschule St. Gallen
10 / 1990 - 11 / 1994 - Mechanical Draftsman
Germann + Frei AG
04 / 1985 - 04 / 1989
Continuing Education
- CAS Digital Learning
ZHAW School of Management and Law
07 / 2023 - European Thermal Spraying Specialist
Schweisstechnische Lehr- und Versuchsanstalt SLV München
10 / 2009
Membership of networks
Swissmem Industriesektor Antriebstechnik ATT
Social media
Projects
- Master3D – 3D-Master for a Digitized Manufacturing Platform / Team member / Project ongoing
- Machbarkeitsstudie Tauchbohrroboter / Team member / Project completed
- Vorstudie Automation Wabenrahmen-Herstellung / Deputy project leader / Project completed
- 3D-Master for "Realtime Manufacturing Services" / Team member / Project completed
- Messsystem - Kräfteverteilung in Planetengetriebe / Project leader / Project completed
- Fertigbarkeitsstudie eines Rotors für neuen Druckwellenlader / Project leader / Project completed
- Eco-friendly carton-based packaging / Team member / Project completed
- Konzept- und Vorprojektstudie für die Entwicklung einer industriellen Pultrusionsanlage / Project leader / Project completed
- Konfigurator für maschinell gefertigte Federn / Project leader / Project completed
- Additives Fertigungsverfahren für Planetengetriebe / Team member / Project completed
- Entwicklung von Schleudergussformen / Project leader / Project completed
- Optimierung des Schwingungsverhaltens eines Vergleichsmikroskops für ballistische Expertisen / Project leader / Project completed
- Vision-Control-Systeme für PO&QS / Project leader / Project completed
- Teilentwicklung einer Schleudergussanlage / Project leader / Project completed
- Mitentwicklung einer Spezialschleifmaschine für die Textilindustrie / Project leader / Project completed
- Cart for magnetic resonance imaging / Project leader / Project completed
- Vision inspection systems for process optimization and quality assurance in the manufacturing of technology components for textile machines / Project leader / Project completed
- Entwicklung einer Schulung für ein zielkostenorientiertes Entwickeln von Holzfeuerungsanlagen / Project leader / Project completed
- Entwicklung eines neuartigen Fertigungsverfahrens für flexible Deckelgarnituren für Textilmaschinen / Project leader / Project completed
- Entwicklung und Herstellung eines Gehäuses für einen Hochleistungs-Laser / Project leader / Project completed
Publications
-
Huber, Frank; Höller, Anton,
2022.
Von 27 Bauteilen auf 1 Bauteil reduziert.
Konstruktionspraxis.
pp. 34-35.
Available from: https://www.konstruktionspraxis.vogel.de/von-27-bauteilen-auf-1-bauteil-reduziert-a-1116239/
-
Huber, Frank,
2015.
Haben Sie Ihre Kosten richtig im Griff?.
Technica.
2015(7), pp. 28-30.
-
Huber, Frank,
2015.
Wie funktioniert die Tower Bridge?.
Aktuelle Technik.
2015(9), pp. 32-33.
Available from: https://doi.org/10.21256/zhaw-4785