Delete search term

Header

Quick navigation

Main navigation

Dr. rer. nat. Helmut Sedding

Dr. rer. nat. Helmut Sedding

Dr. rer. nat. Helmut Sedding

ZHAW School of Engineering
Institute of Data Analysis and Process Design
Technikumstrasse 81
8400 Winterthur

+41 (0) 58 934 71 59
helmut.sedding@zhaw.ch

Work at ZHAW

Position

Senior Research Associate in Operations Research and Operations Management

Focus

Combinatorial optimization algorithms, in particular in scheduling

Education and Continuing education

Education

  • Dr. rer. nat. (PhD) / Computer Science
    ÷
    02 / 2019 - 02 / 2019
  • Diplom (M.Sc.) / Computer Science
    ÷
    2010 - 2010

Network

Awards

Recommendations

Conference "AI-driven Decision Intelligence: Shaping Operations for Efficiency and Sustainability", June 26, 2024.

Projects

Publications

Articles in scientific journal, peer-reviewed
Books and monographs, peer-reviewed
Conference contributions, peer-reviewed
Other publications
Oral conference contributions and abstracts

Publications before appointment at the ZHAW

  • Diese Einträge können nicht mehr überarbeitet werden.   Scheduling non-monotonous convex piecewise-linear time-dependent processing times, Proceedings of the 2nd International Workshop on Dynamic Scheduling Problems, 79–84, 2018.
  • On the complexity of scheduling start time dependent asymmetric convex processing times, Proceedings of the 16th International Conference on Project Management and Scheduling, 209–212, 2018.
  • Scheduling of Time-Dependent Asymmetric Nonmonotonic Processing Times permits an FPTAS, Proceedings of the 15th Cologne-Twente Workshop on Graphs & Combinatorial Optimization, 135–138, 2017.
  • Box Placement as Time Dependent Scheduling To Reduce Automotive Assembly Line Worker Walk Times, Proceedings of the 13th Workshop on Models and Algorithms for Planning and Scheduling Problems, 92–94, 2017.
  • Single Machine Scheduling with Nonmonotonic Piecewise Linear Time Dependent Processing Times, with F. Jaehn, Proceedings of the 14th International Conference on Project Management and Scheduling 2014, 222–225, 2014.