Claudio Gomez
Claudio Gomez
ZHAW
School of Engineering
IDS Institute for Data Science
Technikumstrasse 81
8400 Winterthur
Projects
- Intelligent Framework for Inclusive and Seamless Transport Infrastructure and Mobility Services / Project leader / ongoing
- Optimal annual and daily timetables in SBB traffic management / Team member / ongoing
- Customer orientation in the Traffic Management System / Team member / completed
- Decision support for pandemics / Team member / completed
- SBB-Research Funds 'Automated Timetable Planning' / Team member / completed
- Virtual Coaching for motorcycling sports / Team member / completed
- cleverpendeln / Project leader / completed
- Rail Transport Service Environment / Team member / completed
- Welle 7 / Team member / completed
- Cooperational platform for urban logictis: An economically and ecologically efficient business model for the city of Zürich and other agglomerations / Team member / completed
- Developing new behavioural models for simulating pedestrian flows and an optimized revenue concept / Team member / completed
- Optimized product-service bundle for a new heating system based on fuel cells / Team member / completed
Publications
Articles in scientific journal, peer-reviewed
Wüst, R. M. et al. (2019) 'Maintenance timetable planning based on mesoscopic infrastructure and the transport service intention', Journal of Rail Transport Planning & Management, 11, p. 100146. doi: 10.1016/j.jrtpm.2019.100146.
Written conference contributions, peer-reviewed
- Wüst, R. et al. (2019) 'Improvement of maintenance timetable stability based on iteratively assigning event flexibility in FPESP', in Peterson, A., Joborn, M., and Bohlin, M. (eds) RailNorrköping 2019. Linköping: Linköping University Electronic Press, pp. 1140–1157. doi: 10.21256/zhaw-18282.
- Wüst, R. et al. (2019) 'Periodic timetabling with 'Track Choice'-PESP based on given line concepts and mesoscopic infrastructure', in Operations Research Proceedings 2018. Cham: Springer, pp. 571–578. doi: 10.1007/978-3-030-18500-8_71.
Other publications
- Bütikofer, S. et al. (2023) 'Steigerung der ÖV-Attraktivität durch Optimierung der Anschlusse von Bus zu Bahn', ETR – Eisenbahntechnische Rundschau, 2023(11), pp. 74–77.
- Wüst, R. et al. (2018) Development of a prototype for the automated generation of timetable scenarios specified by the transport service intention. St. Gallen: SBB Forschungsfonds HSG. doi: 10.21256/zhaw-18564.
- Wüst, R. M., Steiner, A. and Gomez, C. (2017) 'Kundenfreundliche und robuste Ersatzfahrpläne während Bau- und Unterhaltsintervallen', ETR – Eisenbahntechnische Rundschau, 2017(10), pp. 57–61. doi: 10.21256/zhaw-4791.
- Heitz, C. and Gomez, C. (2004) 'Inventory management based on simulation of ordering process', in Heitz, C. (ed.) Challenges of globalization for Swiss manufacturing and logistics : proceedings of the 3rd IPLnet workshop, september 9-10, 2003, Ebnat-Kappel, Switzerland. Winterthur: ZHAW Zurich University of Applied Sciences. doi: 10.21256/zhaw-1883.
Oral conference contributions and abstracts
- Wüst, R. M. et al. (2019) 'Improvement of maintenance timetable stability based on iteratively assigning event flexibility in FPESP', in 8th International Conference on Railway Operations Modelling and Analysis (ICROMA), Norrköping, Sweden, 17-20 June 2019.
- Wüst, R. M. et al. (2018) 'Periodic timetabling with 'Track Choice'-PESP based on given line concepts and mesoscopic infrastructure', in OR2018, Operations Research Conference, Brussels, Belgium, 12-14 September 2018. Available at: https://www.euro-online.org/conf/admin/tmp/program-or2018.pdf.