Dr. Peter Fusek
Dr. Peter Fusek
ZHAW
School of Engineering
IDS Institute for Data Science
Technikumstrasse 81
8400 Winterthur
Projects
- Airport Ground Staff Scheduling 2023 / Deputy project leader / completed
- Operational Staff Planning 2021 / Deputy project leader / completed
- Automated Staff Scheduling 2020 / Deputy project leader / completed
- Optimization of Maintenance Scheduling for Hydroelectric Power Plants / Team member / completed
- Energy Optimization for Vessel Operations / Team member / completed
Publications
Other publications
Klinkert, A., Fusek, P., Riesen, B., & Berner, R. (2019). Automated airport staff scheduling at Swissport International Ltd. IFORS News, 13(4), 2–4.
Oral conference contributions and abstracts
- Fusek, P. (2023, October). Airport ground staff scheduling : making impact with a high-performance business application based on integer programming. Gurobi Live! the Decision Intelligence Summit, Barcelona, Spain, 18-19 October 2023.
- Fusek, P., & Klinkert, A. (2019). Airport ground staff scheduling : a real-world business application. 30th European Conference on Operational Research, Dublin, Ireland, 23-26 June 2019.
- Fusek, P. (2019, October 2). Airport ground staff scheduling : a real-world business application. Smith Institute and Gurobi Optimization Partnership Event : Hitting It for Six: Using Optimisation to Unlock Business Efficiencies, London, 2 October 2019.
- Fusek, P. (2018, June 13). Optimized staff scheduling at Swissport. 16th Swiss OR Days, Bern, 12-13 June 2018.
- Fusek, P. (2016). Optimized staff scheduling at Swissport. 1st European COST Conference on Mathematics for Industry in Switzerland, Winterthur, 15 September 2016.
- Fusek, P. (2014). Metric regularity in nonlinear semidefinite programming. International Conference Mathematics Days in Sofia, July 7–10, 2014, Sofia, Bulgaria : Abstracts. http://www.math.bas.bg/mds2014/MDS2014-abstracts.pdf